云顶集团3118

The Chotków Project

The Chotków Project

Chotków, Poland

Utility

The Chotków Solar Project is a 40 MW utility-scale installation located near the German border in western Poland. Developed by EDP in partnership with EPC contractor AYESA, the 40 MW site showcases the resilience and adaptability of TrinaTracker’s FixOrigin structure, which supports more than 62,000 Vertex modules..

The reclaimed site, formerly part of the Adamów mine, features cohesive soils and must endure extreme winter conditions, including temperatures as low as -10°C and snow loads up to 3 kN/m². TrinaTracker’s engineers responded with careful planning and a tailored installation approach to ensure structural stability and long-term performance.

With 1,000 trackers and 40 inverters, the Chotków site now delivers clean electricity to approximately 12,000 homes. The Chotków project reflects Trinasolar’s commitment to dependable technology, precise execution, and a flexible, client-focused approach.